Main Features |
-
500 ~ 12500 RPM spinning speed programmable ( 13000 max for < 60 seconds)
- Accept substrate from 10 mm to 5"
-
PP chamber for anti-corrosive operation.
- One gas inlet port on top of the cover can fill inert gas during coating
- One 20ml Plastic Syringe is included
- Suitable using Ar gas (vacuum pump must be outside glovebox)
- The safety interlock is integrated into the lid
|
Vacuum Chuck
|
- Chamber size: 150 mm diameter
- 2 sets of Aluminum vacuum chucks of different sizes can hold the substrate from 20mm to 100 Dia.
|
Vacuum Pump (Optional)
|
- One compact oilless vacuum pump is optional.
- The feedthrough is needed for the vacuum pump to use in the Ar glovebox equipment. The vacuum pump has to be placed outside of the glove box.
- The feedthrough is not included.
|
Control Panel
|
- The digital control panel can store 12 programs and each program has 6 segments programmable for speeds, acceleration, and spin duration (please click the picture below-right to see the typical program setting)
- Speed: 500 rpm - 12500 rpm programmable
- Duration: 0 - 999 seconds for each segment
- Acceleration: 100 - 2000 rpm / sec adjustable
- Speed Accuracy: < 5%
|
| Input Power |
- AC 110V or 220V is selectable ( please confirm before order )
- 1000 W total for the oilless pump and spin cater
- 24VDC high-speed motor
|
Gas Inlet |
6mm diameter gas inlet port allows customers to fill desired gas into the chamber, which can make coating under an inert gas flow environment.
|
Liquid Injection
|
- Standard Package: 20ml plastic syringe with needle is included Pic. 1 May consider the options below
- Option 1: Precision Electronic Single Channel Pipette: 20 - 200uL (Pic. 2)
- Option 2: Heatable glass syringe with temp. controller, up to 200C (Pic. 3)
- Option 3 Heating cover for drying up to 120 C (Pic. 4)
Pic.1 Pic. 2 Pic. 3 Pic. 4
|
| Compliance |
- Rusting and damage due to improper storage conditions or maintenance are not covered by a warranty
- ALL electric parts are CE, NRTL, and CSA Certified, and no need for extra certification
|
| Warnings |
- Do not over flush the water bowl/base with any kind of liquid. Excess liquid will leak into the motor shaft and cause damage. Please use a fabric cloth to wipe out the residues that remain in the bow/base.
- If necessary, turn on the water outlet when flushing the water bowl/base to avoid liquid overflowing during the operation.
- For more details about the cleaning procedure, please review the cleaning instruction for the spin coaters.
|