| Power |
- AC110V, Single-phase, 50/60Hz, 800W
- AC200V is available upon request
|
| Air Pressure |
- 0.50.8MPa compressed air or inert gas is required for the operation
|
| Sealing Temperature |
- 250ºC Max. ( +/- 2 ºC) for the top and bottom sealing die. (We normally recommend 180-200ºC for pouch cell sealing)
|
| Heated sealing time |
- 0 ~ 90 seconds adjustable (5 ~ 6 seconds recommended)
|
| Inert Gas Cleaning |
- Cleaning with Argon gas and slightly positive pressure before vacuum standing can effectively remove oxygen content and improve the wetting and filtration effect at solid-solid and solid-liquid interfaces of electrodes.
- Cleaning cycle number: 0-90 adjustable
- Cleaning pressure: 0~0.8KPa adjustable
|
| Vacuum Standing and Sealing |
- Vacuum level: Max. not less than -95KPa (The vacuum degree can reach mTorr level by using a mechanical vacuum pump)
- Vacuum standing time: 0~900 seconds adjustable
- Vacuum pre-standing time: 0~90 seconds adjustable
- The vacuum pump is not included. Please click here to order at MTI.
|
| Front and Back Panels
|
- A PLC screen was used to set the sealing parameters and show the operation status.
- Inert gas port, compressive gas port, and vacuum ports are installed on the back panel
- You need an air compressor to operate (not included, please click Pic. 1 to order)
- You need an inert gas tank to purge the chamber(not included)
- The vacuum pump is required for final sealing (not included, please click Pic 2 to order)
-
Pic. 1 Pic. 2
|
Sealing Die
|
- Max battery size: L100 x W100 x Thickness 12 ( mm)
- Heatable sealing blade: 250oC Max with precision digital temperature control
- Sealing width: 4 mm (The sealing width could be customizable)
- Sealing length: 100 mm Max.
- Sealing evenness: ≤ 0.02 mm overlapping precision of top and bottom sealing dies
- Sealing die type: Sealing blade with rubber buffer (soft-sealing)
|
Sealing Pressure
|
- Pressure: 393N Max.
- Consumption: ~ 0.04 L compressed air per sealing
- Please use high-purity inert gasses (Ar or N2), when operating in the glove box. Using Air Compressor driven when operating outside the glove box.
- Please note that the air compressor is not included and is not recommended for use in the glove box.
- Attention: If a gas cylinder is used instead of an air compressor(pic2), a two-stage pressure regulator(pic1) must be installed on the gas cylinder to limit the pressure within the required working range for safe operation.
|
|
Structure
|
- It is easily transferred into the glovebox from the antechamber.
- A flanged tube can be installed to transfer the wires to the glove box without any gas leaks, which is available at extra cost.
|
| Compliance |
- CE Certified
- NRTL Certification is available upon request at an extra cost
|